he previous relay protection and automation system of Nongki substation put into operation in 2000, and extend an 115kV line in 2010. After a long time operated, there are some problems that customers always facing to.
After evaluated seriously, Thailand Provincial Electric Authority (PEA) decide to renovation Nongki substation with co-operation of CYG SUNRI and TC Renewable. The scope of CYG SUNRI: site survey, solution design, production-supply, as-built drawing, transportation, guide of installation, commissioning, training, after-sales service. As the 1st full functional IEC 61850 digital substation, it successfully pushes the application of digital substation in Thailand.