Substation Protection Comprehensive Automation Equipment Technical Transformation Solution
OVERVIEW

CYG SUNRI Substation Protection Comprehensive Automation Equipment Technical Transformation Solution aims to help customers quickly and safely complete the transformation of over-service protection comprehensive automation equipment. The solution adopts new standardized module interface technologies such as modular screen cabinets, split transfer devices and compatible replacement devices, combining with new modes such as replacement transformation and EPC general contracting, to reduce transformation costs, shorten on-site power outage time, and greatly improve technical transformation construction efficiency; at the same time, injects new strength into the implementation of technical transformation to solve the understaffed problem in the secondary technical transformation.

技改1
APPLICATION SCENARIOS
Substations that need to be transformed with expired secondary equipment such as protection and comprehensive automation equipment
技改2
FEATURES
01

(1) Adopts various technical means to reduce the workload on the transformation site, shorten the power outage time, and be safe and reliable;

02

(2) The screen cabinet (switch cabinet door) and external cables are reused to reduce the overall cost of technical transformation and be economical;

03
(3) Supports the transformation of expired equipment from different manufacturers, without involving the risk of single-source procurement of materials;
04

(4) Adopts EPC general contracting mode to shorten the project preparation cycle and reduce user project management work.

Performance Cases

Shandong 500KV Dezhou Power Plant 500kV Line Protection

500kV Busbar Protection for 500kV Shangdang Substation in Zhenjiang, Jiangsu

Transformation of 220kV Monitoring System of 220kV Lincun Substation in Nanning, Guangxi

Transformation of 220kV Monitoring System in Xinjiang Manas Power Plant

Transformation of Monitoring System of 110kV Qionghua Substation in Yangzhou, Jiangsu

Transformation of Monitoring System of 110kV Liangshui Town Substation in Liaocheng, Shandong