Power Plant (Thermal Power/Hydro Power) Substation NCS System Solution
OVERVIEW
The PRS-7000 power plant power network control system (NCS) integrates various functions, such as anti-maloperation locking, intelligent equipment information integration,remote control communication, protection information management and local monitoring. This system can be seamlessly connected to the protection, measurement and control device and intelligent equipment from different manufacturers, so as to complete information processing, display and monitoring of step-up substation of power plant, facilitate monitoring and control of equipment, and provide reliable assurance for the safe and economical operation of the step-up substation.
NCS2
APPLICATION SCENARIOS
The PRS-7000 power plant NCS system is applicable to the step-up substations of power plants with various voltage levels.
NCS1
FEATURES
01

(1) This solution can adapt to the requirements of power plant NCS systems with differentunit capacities, and provide one-stop protection, measurement, control and system integration services;

02

(2) With an open system structure and flexible networking mode, this solution can provide widely support to processing analysis and information exchange of various communication protocols in the industry;

03

(3) This solution has a comprehensive security design,and employs complete operation security, communication security and software security assurance strategies;

04

(4) This solution has high reliability, good real-time performance, and flexible configuration, which supports seamless access to systems such as protection, measurement and control,dispatching at all levels, GPS time synchronization, MIS/SIS and protection management, and also supports remote transmission of information, such as dispatching automation, protection, and management in the station;

05

(5)The bay layer equipment adopts 32-bit floating-point DSP (120M) and 16-bit high-precision AD sampling, 32-point sampling is carried out per cycle, 15 harmonic analyses can be provided, it has multi-CPU parallel processing, and the second & minute pulse and IRIG-B time calibration methods are adaptive.

Performance Cases

Tashan Kengkou Power Plant 500kV NCS Project in Datong, Shanxi Province

220kV Booster Station (NCS) Project of Qinghe Power Generation Co., Ltd. in Tieling, Liaoning Province

Huaneng Yingkou Thermal Power Plant 220kV Booster Station (NCS) Project in Liaoning Province

State Power Dalian Development Zone Thermal Power Plant 220kV Booster Station (NCS) Project in Liaoning Province

Power Beijing Dongbei Thermal Power (Gaoantun Power Plant) 220kV Booster Station (NCS) Project

Hepo Power Plant 220kV Booster Station (NCS) Project in Yangquan, Shanxi Province

Datang Huangdao Power Plant 220kV NCS Project in Qingdao, Shandong Province

State Power Langfang Thermal Power Plant Supercritical Unit 220kV NCS Project