2020-12-05
Xinjiang Mulei 220 kV Laojunmiao West Wind Power Cluster EPC Project by CYG Design Connected to the Grid and Put into Operation
Xinjiang Mulei 220 kV Laojunmiao West Wind Power Cluster EPC Project by CYG Design Connected to the Grid and Put into Operation
On March 11th, the leaders of State Grid Co., Ltd. inspected the construction project of Shandong Tai'an 220kV Tianping Intelligent Substation led by CYG SUNRI, and the construction effect of the project was praised by leaders at all levels.